![]() International Journal of Production Economics 171:134–150 Rivera-Gómez H, Gharbi A, Kenné JP, Montaño-Arango O, Hernandez-Gress ES (2016) Production control problem integrating overhaul and subcontracting strategies for a quality deteriorating manufacturing system. IEEE Transactions on Automatic Control 46(3):441–449 Perkins J, Srikant R (2001) Failure-prone production systems with uncertain demand. In: Proceedings of the 19th IEEE Conference on Decision and Control. Olsder GJ, Suri R (1980) Time-optimal control of flexible manufacturing systems with failure prone machines. IEEE Transactions on Automatic Control 55(10):2401–2406 Martinelli F (2010) Manufacturing systems with a production dependent failure rate: Structure of optimality. IEEE Transactions on Automatic Control 38(2):340–343 Malhamé R (1993) Ergodicity of hedging control policies in single-part multiple-state manufacturing systems. IEEE Transactions on Automatic Control 39(4):889–895 Liberopoulos G, Caramanis M (1994) Production control of manufacturing systems with production rate-dependent failure rates. Kimemia JG, Gershwin SB (1983) An algorithm for the computer controlof production in a flexible manufacturing systems. Karabağ O, Tan B (2018) Purchasing, production, and sales strategies for a production system with limited capacity and fluctuating sales and purchasing prices. Annals of Operations Research 125(1):191–204 Hu JQ, Vakili P, Huang L (2004) Capacity and production managment in a single product manufacturing system. IEEE Transactions on Automatic Control 40(2):291–295 Hu J (1995) Production rate control for failure prone production with no backlog permitted. SIAM Journal of Control Optimization 31:1183–1204 Ghosh M, Araposthathis A, Markus S (1993) Optimal control of switching diffusions with applications to flexible manufacturing systems. Gershwin SB, Tan B, Veatch MH (2009) Production control with backlog-dependent demand. Gershwin SB (1994) Manufacturing Systems Engineering. International Journal of Production Economics 150:174–187 SIAM Journal of Control Optimization 25:1495–1502įrancie KA, Jean-Pierre K, Pierre D, Victor S, Vladimir P (2014) Stochastic optimal control of manufacturing systems under production-dependent failure rates. IEEE Transactions on Automatic Control 47(7):1167–1174įleming W, Sethi S, Soner H (1987) An optimal stochastic production planning with randomly fluctuating demand. Operations Research 36(4):532–541įeng Y, Xiao B (2002) Optimal threshold control in discrete failure-prone manufacturing systems. IEEE Transactions on Automatic Control AC–31(2):116–126īielecki T, Kumar PR (1988) Optimality of zero-inventory policies for unreliable manufacturing systems. Journal of Optimization Theory and Applications 167(2):716–732Īkella R, Kumar PR (1986) Optimal control of production rate in a failure prone manufacturing system. It is shown that controlling the production rate optimally allows producers respond to the fluctuations in price, cost, and demand in an effective way and maximize their profits.Īhmadi-Javid A, Malhamé R (2015) Optimal control of a multistate failure-prone manufacturing system under a conditional value-at-risk cost criterion. The effects of production cost, production capacity, demand variability, and the dependence of the demand and the cost on the performance of the system are analyzed analytically and numerically. However when the backlog is below the lower hedging level, the producer produces with the maximum capacity regardless of the cost. According to this policy, the producer produces only when the cost is low and the surplus is between the two hedging levels. The performance of the system where the production cost alternates between a high and a low cost level and the demand is either constant or also alternates between a high and a low level is analyzed under the double-hedging policy. By using a continuous flow model, the optimal production policy is stated as a state-dependent hedging policy. ![]() The transitions between different environment states evolve according to a time-homogenous Markov chain. In each environment state, the price, cost, and demand take different levels. The uncertainties in the system are captured jointly in discrete environment states. The objective of the flow rate control problem is maximizing the average profit that is the difference between the expected revenue and the expected production, inventory holding, and backlog costs. An optimal production flow control problem of a make-to-stock manufacturing firm with price, cost, and demand uncertainty is studied. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |